Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Los Altos Hills
Home additions and ADU construction in Los Altos Hills typically run $45,000-$130,000 for room additions and $90,000-$220,000 for detached ADUs, with timelines driven by Architectural Site Committee review, WUI fire-resistive compliance, and long-lead custom materials rather than framing labor. We’re Rowan Construction Group Mountain View, and our crews serve Los Altos Hills from our San Francisco Bay Area office. Dispatch and scheduling are coordinated locally, and we arrive with the same discipline we’ve applied to 4,000-plus projects since 2007: a written price before any work starts, a signed change order before any scope changes, and a documented photo record when the crew leaves. Call (669) 215-4852 to schedule your free estimate.
Why Rowan Construction Group Mountain View Is Los Altos Hills’s Preferred Home Additions & ADU Company
We’ve built second-story additions and detached ADUs on the sloped, oak-studded lots off Westwind Way, on the serpentinite-influenced soils near Purissima Road, and in the older ranch neighborhoods between Altamont and Robleda Roads where cut-and-fill foundations from the 1960s still carry the house. Los Altos Hills homeowners read the three-star reviews and ask about the draw schedule, the septic sequencing, and whether the ASC has already seen the elevations. We answer with documentation: our 365-Day Done Right Promise is printed on every page and backed by a terms page, not an asterisk; our license number appears on every proposal; and our background-checked, uniformed technicians arrive with a photo record that shows what was found and what was done.
A live person answers our phones 24/7. Our Free Second Opinion on any written estimate means you can bring a competitor’s line-item quote and we’ll review it at no charge. Under Clause 1 of The Haven Standard, the price is written before anyone starts. That discipline is why our projects finish within a few percent of the number the customer agreed to.
Our Home Additions & ADU Services in Los Altos Hills

ADU Design & Permitting
Every Los Altos Hills ADU must clear the Town’s Architectural Site Committee while simultaneously meeting Cal Fire WUI standards for ignition-resistant construction. We prepare the ASC submittal package, coordinate the geotechnical report for hillside parcels, and sequence the Santa Clara County Environmental Health septic evaluation before design finalization. A large share of Los Altos Hills parcels remain on private septic; a rebuild that triggers a percolation test and septic redesign can silently add four to six months. We build that contingency into the written schedule and price before you sign.

Garage Conversion ADU
Converting a garage in Los Altos Hills means more than drywall and a kitchenette. The structure must meet WUI fire-resistive standards for exterior cladding and ember-resistant venting, and if the parcel sits on private septic, the additional bedroom count may trigger county review. We assess the existing foundation, the panel capacity, and the septic capacity in the same site visit, then deliver a written price that includes all three compliance paths.

New Detached ADU
A detached ADU on a 1-acre Los Altos Hills lot requires engineered retaining walls for the expansive clay and serpentinite-influenced soils, Class A roofing, and ignition-resistant siding. We fix the scope, allowances, and order dates in writing before cutting a single purchase order. The kitchen gets KraftMaid or Wellborn cabinetry, the countertops run Cambria or Caesarstone, and the schedule is held around the cabinet lead time and architect-driven custom millwork rather than framing labor.

Junior ADU & Interior Conversion
Junior ADUs in Los Altos Hills often occupy existing footprint within 1950s-1970s ranch homes with original galvanized plumbing and no seismic retrofitting. We evaluate the panel, the plumbing, and the structural capacity before quoting, because addressing these conditions inside the written price is cheaper than a signed change order mid-project.

Second Story Additions
The dominant housing stock in Los Altos Hills is 1950s-1970s ranch-style homes on sloped lots with cut-and-fill foundations. Before we design a second story, we order the geotechnical report and assess whether the foundation needs reinforcement or replacement. The Santa Cruz Mountain foothill terrain produces steep slopes with expansive clay soils that require engineered retaining walls for virtually any ground-disturbing work. We don’t price this like flat-lot Los Altos work.

Room Additions & Sunrooms
Room additions in Los Altos Hills must satisfy the same triple-compliance burden as larger projects: ASC design review, WUI construction mandates, and hillside grading requirements. We coordinate the architect, the structural engineer, and the ASC reviewer from the first site visit so the design doesn’t return for revision after long-lead items are ordered.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Before
AfterTrusted Brands We Service in Los Altos Hills
Our sourcing depth across fifty-plus vetted brands gives the written quote honest numbers rather than inflated ones. For Los Altos Hills additions and ADUs, we regularly specify KraftMaid and Wellborn cabinetry, Cambria and Caesarstone countertops, and Belgard or Techo-Bloc pavers for exterior hardscape. We don’t markup long-lead custom millwork or architectural glass; the allowance is fixed in writing before ordering, and any substitution is handled through a signed change order. Our relationships with these suppliers mean we can confirm lead times and reserve production slots before the ASC approves final elevations, keeping the schedule intact when labor is ready but the cabinets are twelve weeks out.
Common Home Additions & ADU Problems We See in Los Altos Hills Homes

- Treating the septic system as an afterthought. An older Los Altos Hills parcel on private septic can trigger a Santa Clara County Environmental Health percolation test and full septic redesign mid-project, adding four to six months the draw schedule never accounted for. We test and sequence this before breaking ground.
- Ordering designer-grade cabinetry and architectural glass before ASC sign-off and WUI cladding specs are locked. Then absorbing the cost of a change order when the design or fire-rating detail shifts. We hold all long-lead purchases until the ASC and WUI scope is frozen in writing.
- Assuming a hillside addition can be priced like flat-lot Los Altos work. The expansive clay and serpentinite soils demand site-specific geotech and engineered retaining walls. We include both in the original written scope.
- Skipping seismic evaluation on 1960s-1970s ranch structures. Original construction predates modern seismic standards, and an unretrofitted foundation can double the structural budget if discovered after demolition. We assess this in the first site visit.
Pricing for Home Additions & ADU in Los Altos Hills, CA
A typical home addition in Los Altos Hills runs $45,000-$130,000. ADU construction runs $90,000-$220,000. Second story additions fall within the same $45,000-$130,000 range, while garage conversions run $30,000-$80,000. Cabinet installation for custom kitchen builds runs $4,000-$13,000, countertop installation $2,000-$6,500, and kitchen island installation $3,000-$10,000.
| Service | Price Range in Los Altos Hills |
|---|---|
| Home Addition | $45,000-$130,000 |
| ADU Construction | $90,000-$220,000 |
| Second Story Addition | $45,000-$130,000 |
| New Detached ADU | $90,000-$220,000 |
| Garage Conversion | $30,000-$80,000 |
| Cabinet Installation | $4,000-$13,000 |
| Countertop Installation | $2,000-$6,500 |
| Kitchen Island Installation | $3,000-$10,000 |
What moves the number: hillside grading and engineered retaining walls, geotechnical reports, ASC revision cycles, WUI-compliant cladding and roofing upgrades, septic percolation testing and redesign, and long-lead custom millwork or architectural glass. We fix all allowances and order dates in writing before cutting purchase orders. No work proceeds on a change until the change order is signed. Call (669) 215-4852 for an exact quote on your project - estimates are free, and we deliver a written price before any work starts.
We Also Serve Cities Near Los Altos Hills

Our Home Additions & ADU crews work throughout the mid-Peninsula, including Los Altos Hills, Mountain View, Los Altos, Sunnyvale, and Palo Alto. Each city carries different compliance requirements; Los Altos Hills’s triple burden of ASC review, WUI mandates, and septic sequencing is qualitatively different from the flat, grid-street cities immediately to the east.
Serving Los Altos Hills, CA - Our Local Coverage Area
We’re based in the Los Altos Hills area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Home Additions & ADU in Los Altos Hills

Los Altos Hills additions face a triple-compliance burden that flat, fully sewered cities don’t: Architectural Site Committee design review, Cal Fire WUI ignition-resistant construction standards, and - for the large share of parcels on private septic - Santa Clara County Environmental Health percolation testing and potential septic redesign. That last item alone can add four to six months before a single order is placed. Call (669) 215-4852 to schedule your free estimate and we’ll walk through the specific timeline for your parcel.
We fix scope, allowances, and order dates in writing before cutting any purchase order. On a 1968 ranch off Westwind Way, we held the schedule around Wellborn’s long-lead cabinet run and architect-driven custom millwork while ASC review, WUI cladding specs, and county septic testing ran in parallel. The price and the delivery dates were locked before framing started. Call (669) 215-4852 for an exact quote - estimates are free.
WUI, or Wildland-Urban Interface, compliance mandates Class A roofing, ember-resistant vents, and ignition-resistant exterior cladding on virtually every Los Altos Hills parcel because the entire town sits in a Cal Fire Very High Fire Hazard Severity Zone. These aren’t nominal designations; the concentrated wind during fire weather on these foothill slopes carries genuine engineering consequences. The materials cost more than standard suburban finishes, and the detailing is inspected. We include WUI-specified allowances in the original written price. Call (669) 215-4852 to schedule your free estimate.
Yes, virtually always. The Santa Cruz Mountain foothill terrain produces steep slopes with expansive clay and serpentinite-influenced soils that shift and settle unpredictably. The original cut-and-fill foundations on these ranches were not engineered for additional loads. We order the geotech report before quoting structural work, and we include engineered retaining walls in the scope when the site demands them. Call (669) 215-4852 for an exact quote - estimates are free.
Documentation and signed terms. Under The Haven Standard, every project carries a written flat price, a written scope, and a 365-Day Done Right Promise printed on every page and backed by a terms page. Every visit produces a documented photo record included as standard. No change proceeds without a signed change order. The customer leaves with evidence of what was found and what was done. Call (669) 215-4852 to schedule your free estimate.
Ready to price your Los Altos Hills addition or ADU? Call (669) 215-4852 to schedule your free estimate. We’ll deliver a written flat price with a written scope and warranty before any work starts, and we’ll fix the order dates for your long-lead materials before the ASC review is complete.
Written by Grant Rowan, Owner at Rowan Construction Group, serving Los Altos Hills since 2007.







Before
After
Before
After
Before
After